Description We have some of these PDU with faulty screens, and no spares left to replace them. They still work and have all the information on the network interface (access via the web, the IP comes from DHCP hanshake, or ask us to pre-set a static IP). They are discounted because of the screen issue. We reset the user name and password to apc (both lower case) to allow you to configure easily when it arrives. We also reset the IP configuration to DHCP and BOOTP by default. As this is a masterswitch you can turn off/on the power to each individual socket on the PDU. These have a stagger start, to help with power on inrush. We have the PDF user guides. Packing is important for these long PDU, and we have experience in this. Our products are comprehensively tested by UPS experts and are fully working. They are second user, and will have cosmetic signs of previous use. We have been supplying UPS since 2002 and are the respected leader in the field, our experience reduces the occurrence of problems, and the availability of resources and stock we hold means we have the ability to quickly resolve issues when they do arise. This is a broad stroke estimation, as our items are of varying complexity. All of our consignments are sent fully insured on a 24 hour service with our carriers. We cover all problems that occur in transit. We have the packing materials to make sure that there are few problems in transit. Our warehouse is based in the UK. Specification Rack PDU 2G, Switched, ZeroU, 32A, Input Connection 1x IEC309-32 Amp (blue commando) plug. Nominal Input Voltage 200V, 208V, 230V. Overload Protection Yes Maximum Total Current Draw 32 Amps Output Connections: 3x IEC 320 C19 21x IEC 320 C13 Maximum Height 182.9 cm Maximum Width 5.6 cm Maximum Depth 4.6 cm Net Weight 7.59 kg APC Switched Rack Power Distribution Units (PDUs) enable advanced, user-customisable power control and active monitoring. Remote outlet level controls allow power on/off functionality for power recycling to remotely reboot equipment and restrict unauthorized use of individual outlets. Power sequencing delays allow users to define the order in which to power up or down attached equipment. Avoid circuit overload during power recovery and extend uptime of critical equipment by prioritizing the load shedding. Current metering provides real-time remote monitoring of connected loads. Switched Rack PDUs include real power monitoring, a temperature/humidity sensor port, locking IEC receptacles, and low profile circuit breakers. User-defined alarms warn of potential circuit overloads before critical IT failures occur. Users can access, configure, and control Switched Rack PDUs through secure Web, SNMP, or Telnet Interfaces and is complimented by APC Centralized Management platforms using InfraStruxure Central, Capacity Manager and Change Manager.